• Wide variety of material encountered - from heavy boulder fill to bands of gravels, sands and silts
  • Severe lack of room between the stream edge and various buildings
  • Working around business and industry daily operations

Waiwhetu Stream

Project scope

Thirty five boreholes and twenty three CPTs were required across the extent of the site. The sites included working on the road for bridge pile information, open public areas alongside the stream and in the confirms of industrial operations and a holiday park.
 

Complicating factors

The bore holes were a mixture of cored holes with SPTs at 1.5m and fully core holes and were supplemented by the results from the CPTs.

The material encountered varied from heavy boulder fill at the Hutt River mouth where the the stream exits, to bands of gravels, sands and silts. The team at Griffiths Drilling worked with the clients URS New Zealand Ltd and AC Consulting Group Ltd to ensure the results needed from the difficult conditions were obtained.

Access to the stream was sometimes complicated by the lack of room between the stream edge and the various buildings alongside and the drilling teams had to work around the operations of the various industries and businesses whose areas we were working in.

For safety, with a large number of utility feeders to the industrial area of Seaview, all bore holes were vacuum excavated prior to drilling to ensure any services not identified through plans were picked up.

Enquiry

Question

Projects

This section highlights some key drilling projects that Griffiths Drilling have been involved in. It also includes 'Projects Since 1971' and 'Earlier Projects' pages to showcase our extensive history and experience within the New Zealand drilling industry.

Mackays to Peka Peka Expressway (M2PP)

This $630 million project will deliver approximately 18km of 4 lane expressway through Paraparaumu and Waikanae, including a new bridge over the Waikanae River. Griffiths Drilling has been part of this project from its inception.

Transmission Gully

Transmission Gully is the biggest road construction challenge in the Wellington region. We began exploration work in 2007 for Opus. Further work was undertaken in 2013 for MWH and NZTA, with detailed geotech investigations for Leighton Contractors and Coffey Geotechnical in 2014 and 15.

Tauhara Geothermal - Geotechnical Drilling Adviser & Consultant

Mel Griffiths was engaged by Contact Energy as the Geotechnical Drilling adviser for the Tauhara Geothermal Subsidence project.

Wind Farm

Limited access, steep terrain, wet slippery conditions and very high winds were complicating factors. Also the rock was very fractured due to the proximity of the main fault line.

Muldoons Corner

This is a difficult section of SH2 which needed realignment. It's located near the summit of the narrow Rimutaka Hill Rd and features tight corners, no shoulder and near vertical faces above and below the road.

Dowse to Petone

A $65 million road improvement carried out to enhance the traffic flow on SH2. Flexibility of resources was paramount on this project, which included 45 piles at 7 sites and a new service road, requiring soil nails.

Silverstream Landfill

A large landfill site serving two cities that required anchor and drainage holes in rows along the walls of the gullies. Communication was important as all work was done around the customers programme of concrete spraying.

Centre Point Wharf Piles

This project was carried out over water on a barge in the very busy Wellington Harbour. As if this wasn't enough, matters were further complicated as quality samples had to be recovered from very soft sediments.

Transpower Tower

This project involved upgrading the foundations on transmission line towers in the upper South Island. We are proud to be associated with the 2007 New Zealand Engineering Excellence Awards Supreme Award winner.

Soil Nail Wall

Construction of a retaining wall that included drilling and testing a sacrificial nail for design purposes, drilling and installing production nails, fabrication of nail heads, fixing mesh to the face and applying sprayed concrete.

Projects Since 1971

A list of all the major projects undertaken by Griffiths Drilling since its inception. Work includes some of New Zealand's most challenging and largest drilling projects, including the Clyde dam, Wellington Motorway, Te Papa, Westpac Trust Stadium and the ongoing Transmission Gully work.

Projects from 1948 to 1970

Projects completed before Griffiths Drilling became an official business. They show the experience that is inherent in our drilling business today. Work includes Waikato, Waitaki, Roxborough and Cobb Valley dams, Tongariro Power and Wairakei Geothermal projects along with others.

Water Bores

We have well over 40 years experience in drilling water bores. Most have been carried out in the Wellington, Hutt Valley, Kapiti Coast and Wairarapa regions, giving us an unequaled and comprehensive knowledge of the ground aquifers within these areas.