  • Aerial view of Griffiths Drilling barge working on iRex Project in Wellington harbour

    iRex Interislander Terminals

    KiwiRail’s iReX project will provide faster, safer, more enjoyable Te Moana o Raukawakawa (Cook Strait) journeys, with less environmental impact. Our team have drilled multiple deep geotechnical boreholes and CPT tests, on land and in the harbour.

    Read more
  • Artists drawing of RiverLink concept in Lower Hutt

    RiverLink – Lower Hutt

    Te Wai Takamori o Te Awa Kairangi is a transformational project for Te Awa Kairangi ki Tai – Lower Hutt. Griffiths Drilling is proud to have been involved in Phases 1 to 4, and are about to commence on Phase 5 of this fantastic project.

    Read more
  • Mackays to Peka Peka Expressway (M2PP)

    This $630 million project will deliver approximately 18km of 4 lane expressway through Paraparaumu and Waikanae, including a new bridge over the Waikanae River. Griffiths Drilling has been part of this project from its inception.

    Read more
  • Transmission Gully

    Transmission Gully is the biggest road construction challenge in the Wellington region. We began exploration work in 2007 for Opus. Further work was undertaken in 2013 for MWH and NZTA, with detailed geotech investigations for Leighton Contractors and Coffey Geotechnical in 2014 and 15.

    Read more
  • Tauhara Geothermal – Geotechnical Drilling Adviser & Consultant

    Mel Griffiths was engaged by Contact Energy as the Geotechnical Drilling adviser for the Tauhara Geothermal Subsidence project.

    Read more
  • Wind Farm

    Limited access, steep terrain, wet slippery conditions and very high winds were complicating factors. Also the rock was very fractured due to the proximity of the main fault line.

    Read more
  • Muldoons Corner

    This is a difficult section of SH2 which needed realignment. It’s located near the summit of the narrow Rimutaka Hill Rd and features tight corners, no shoulder and near vertical faces above and below the road.

    Read more
  • Dowse to Petone

    A $65 million road improvement carried out to enhance the traffic flow on SH2. Flexibility of resources was paramount on this project, which included 45 piles at 7 sites and a new service road, requiring soil nails.

    Read more
  • Silverstream Landfill

    A large landfill site serving two cities that required anchor and drainage holes in rows along the walls of the gullies. Communication was important as all work was done around the customers programme of concrete spraying.

    Read more
  • Centre Point Wharf Piles

    This project was carried out over water on a barge in the very busy Wellington Harbour. As if this wasn’t enough, matters were further complicated as quality samples had to be recovered from very soft sediments.